Arab Idol Lebanon

Arab Idol Lebanon

photo of the first live show of 2015

©2012-2015 . photo by Unknown

project summary

Arab Idol Lebanon

2012-2015

Pivot / LedGo / MBC

Set Design Associate / Supervision


Intro

Local crew safety training, learning to fly the helicopter and last-minute design changes...

The Bigger Picture

project pictures

photo of my office at MBC studios Lebanon

©2012-2015 . photo by Gert Muurling

here's to all the crew!

photo of Ghodr, local crew dusting the light fixtures

©2012-2015 . photo by Gert Muurling

photo of local crew painting setparts by hand

©2012-2015 . photo by Gert Muurling

photo of the Dutch crew installing cyberhoist system

©2012-2015 . photo by Gert Muurling

photo of local and Dutch crew, looking up in awe

©2012-2015 . photo by Gert Muurling

photo of Nserat, a local crew mamber, being taught about climbing and safety

©2012-2015 . photo by Gert Muurling

photo of me, a happy chief!

©2012-2015 . photo by Hani Zouein

photo of Hans, driving one of our remote controlled helicopters

©2012-2015 . photo by Gert Muurling

photo of a remote controlled helicopter following one of the local crew

©2012-2015 . photo by Gert Muurling

photo of Nserat, happily cutting away in the set

©2012-2015 . photo by Gert Muurling

photo of the local setbuilder's crew manually c&c-ing the stage

©2012-2015 . photo by Gert Muurling

photo of the local setbuilder's crew manually c&c-ing the stage

©2012-2015 . photo by Gert Muurling

photo of the local and Dutch crew having fun

©2012-2015 . photo by Gert Muurling

photo of the center mark for the audience position

©2012-2015 . photo by Gert Muurling

start from scratch

photo of the empty studio at MBC Lebanon

©2012-2015 . photo by Gert Muurling

photo of the lighting system being installed

©2012-2015 . photo by Gert Muurling

photo of the cyberhoist system being installed

©2012-2015 . photo by Gert Muurling

photo of the cyberhoist system being programmed

©2012-2015 . photo by Gert Muurling

learning to fly..

photo of the cyberhoists learning to fly

©2012-2015 . photo by Gert Muurling

photo of 32mm videoscreens messaging for a coffee break

©2012-2015 . photo by Gert Muurling

photo of custom light rigs

©2012-2015 . photo by Gert Muurling

photo of the high resolution videodoors being installed

©2012-2015 . photo by Gert Muurling

photo of the videoscreens seen from the back

©2012-2015 . photo by Gert Muurling

close-up photo of a 32mm video panel

©2012-2015 . photo by Gert Muurling

photo of the nearly completed set

©2012-2015 . photo by Gert Muurling

project story

Article

At MBC studios, Beirut, Lebanon we did three tours of Arab Idol. It usually takes just a few days of preparing and several weeks of on-site supervision before a deliverable set can be produced. This is primarily due to the availability of materials, and subsequently, the inevitable on-site design changes. Then there's the mere fact that for the most part, these sets are being custom made, meaning there's little or no preparation at the factory, most of it will be built from the ground up at the studio. At times this will make construction a challenge, to say the least, but at the same time, most of the fun happens when things go haywire...